c/kWh
per week
$/kLusage charge on your water bill
Capacity
8 kg
Front loader
Energy rating
4.5
Annual electricity use
141 kWh
Label: 248 kWh · 0.68 kWh per wash
Estimated running cost
$45 / year
$45 electricity + $0 water · $452 over 10 years
Water per wash
0.0 L · Cotton, Temp: 40 C, Spin speed: 1400 rpm, Extra Rinse programme

3% less electricity than the median of 98 comparable 8 kg front loader washing machine registrations (256 kWh a year on the label basis). It uses less than 53% of them. At your rates that is about $1 a year less than the median, $14 over 10 years.

How efficient is it for its size?

kWh per year. Bar: the middle 80% of 98 comparable 8 kg front loader washing machine registrations. Dot: this model (below the median). Hover or tab to a mark for its value.

Cohort: every currently registered 8 kg front loader washing machine sold in Australia, counted once per registration, on the label usage basis.

Washing machines similar to the Hisense HWFS8014AB

No comparable registrations of the same type and size from other brands.

Compare HWFS8014AB with another washing machine

Hisense HWFS8014AB specifications

Loading
Front loader
Rated capacity
8.0 kg
Combined washer-dryer
No
Wash action
–
Water per wash
0.0 L
Water efficiency index
0.551
Programme tested
Cotton, Temp: 40 C, Spin speed: 1400 rpm, Extra Rinse
Programme time
295 min
Internal heater
–
Dimensions (W×H×D)
595 × 845 × 620 mm
Annual energy (label)
248 kWh
Star rating index
4.51
Country of manufacture
China

Australian GEMS registration details

Registration number
ACW1318
GEMS registration id
153850
Status
approved, available (self-reported)
Registration expires
24 April 2028
Registered for sale in
Australia, New Zealand
Family
–
Regulatory standard
Greenhouse and Energy Minimum Standards (Clothes Washing Machines) Determination 2024
Test standard
AS/NZS 2040.1:2005/Amdt 3:2010

Source: Australian Government Energy Rating (GEMS) registration data, DCCEEW via data.gov.au (CC BY 3.0 AU). Dataset published 22 September 2026; last checked 23 September 2026. How the derived figures are calculated.