New Zealand · costs in NZD

Front loader · 8.5 kg
Chiq WDFL85 series Washer Dryer
Chiq WDFL85 series is a 8.5 kg front loader washer dryer registered for sale in New Zealand under the trans-Tasman E3 energy rating scheme (registration ACW1438). The registered figures are for its wash cycle.
- Wash capacity
- 8.5 kg
- Front loader
- Energy rating
- 4
- Annual electricity use
- 183 kWh
- Label: 321 kWh · 0.88 kWh per wash
- Estimated running cost
- $60 / year
- $60 electricity + $0 water · $604 over 10 years
- Water per wash
- 0.0 L · Cotton, 40℃, 1400 rpm programme
32% more electricity than the median of 26 comparable 8 kg front loader washer dryer registrations (244 kWh a year on the label basis). It uses less than 12% of them. At your rates that is about $14 a year more than the median, $145 over 10 years.
How efficient is it for its size?
Cohort: every currently registered 8 kg front loader washer dryer sold in New Zealand, counted once per registration, on the label usage basis.
Washer dryers similar to the Chiq WDFL85 series
No comparable registrations of the same type and size from other brands.
Compare WDFL85 series with another washer dryer
Chiq WDFL85 series specifications
- Loading
- Front loader
- Rated capacity
- 8.5 kg
- Combined washer-dryer
- Yes
- Wash action
- –
- Water per wash
- 0.0 L
- Water efficiency index
- 0.589
- Programme tested
- Cotton, 40℃, 1400 rpm
- Programme time
- 357 min
- Internal heater
- –
- Dimensions (W×H×D)
- 600 × 847 × 577 mm
- Annual energy (label)
- 321 kWh
- Star rating index
- 4.03
- Country of manufacture
- China
Other model numbers on registration ACW1438
New Zealand E3 registration details
- Registration number
- ACW1438
- GEMS registration id
- 161865
- Status
- approved, available (self-reported)
- Registration expires
- 27 May 2029
- Registered for sale in
- Australia, Fiji, New Zealand
- Family
- WDFL85 series
- Regulatory standard
- Greenhouse and Energy Minimum Standards (Clothes Washing Machines) Determination 2024
- Test standard
- AS/NZS 2040.1:2005/Amdt 3:2010
Source: E3 programme registration data (EECA, New Zealand) (trans-Tasman E3 registration data published by DCCEEW on data.gov.au, CC BY 3.0 AU). Dataset published 22 September 2026; last checked 23 September 2026. How the derived figures are calculated.